Sample report

What you receive: a sample comparison report

This is the structure we deliver for a factory sourcing report. All company names, numbers and findings below are invented to illustrate the format.

SAMPLE TEMPLATE — EXAMPLE DATA ONLY. "Supplier A/B/C", the buyer, prices and findings are fictional. This is not a real client, not a real factory and not a real result. It shows the format and the kind of checks we run.
Factory sourcing report · SAMPLE

Vented brake discs, grey iron — 6 SKUs

Prepared for: Example Buyer GmbH (fictional) · Report ref. LS-SAMPLE-001

Issued
[date]
Prepared by
Lever Sourcing, Jinan
Suppliers
3 shortlisted · 9 excluded

1. Declarations

  • Conflict of interest: None of the suppliers in this report is, or has been in the past 24 months, a marketing client of Zhidian Network. (If one were, it would be named here and we would recommend an independent audit instead of our verification.)
  • No commission: Lever Sourcing has received no payment, rebate, gift or other benefit from any supplier in this report, and will not accept any if you place an order.
  • Payment: If you order, you pay the supplier directly. Lever Sourcing never receives payment for goods.

2. Your brief (summary)

Product
Vented brake discs, 6 passenger-car references, grey cast iron (example spec HT250), anti-rust coating, individual retail box
Quantity
[e.g. 2,000 pcs per SKU per order; 4 orders per year]
Target price
[buyer's target, per pc, FOB Qingdao]
Destination
EU
Compliance
ECE R90 approval for the relevant references; material certificate per batch
Timeline
Samples in 4 weeks; first order in 10 weeks

3. Comparison example data

ItemSupplier ASupplier BSupplier C
LocationShandong (example)Shandong (example)Hebei (example)
Type (our assessment)Manufacturer: casting + machining in-houseTrading company; sources from 2 foundriesManufacturer; machining outsourced
How we checkedDesk check + on-site visitDesk checkDesk check + video tour
Unit price, FOB Qingdao$X.XX @ 2k · $X.XX @ 5k$X.XX @ 2k · $X.XX @ 5k$X.XX @ 2k · $X.XX @ 5k
MOQ300 pcs per SKU100 pcs per SKU500 pcs per SKU
Tooling / pattern costPer new reference: $[x]Included (on stock patterns only)Per new reference: $[x], refundable after [y] pcs
Samples2 pcs per SKU, $[x], 15 daysStock samples, $[x], 7 days2 pcs per SKU, $[x], 20 days
Production lead time35–40 days30 days (depends on foundry)45 days
Payment terms offered30% T/T deposit, 70% before shipmentTrade Assurance, 30/7030% T/T, 70% against B/L copy
ECE R90verified 4 of 6 referencesclaimed certificate holder is the foundry, not Bunclear application in progress
ISO 9001 / IATF 16949verified IATF 16949 (looked up)claimed ISO 9001 of foundryverified ISO 9001
Risk flagsCoating line at capacity Q1Foundry not disclosed until askedMachining sub-supplier not visited

4. Verification detail — Supplier B example data

CheckResultEvidence / note
Business licence matches quoting companyverifiedName and credit code match the record on gsxt.gov.cn
Registered scope includes manufacturingmismatchScope lists sales and import/export of auto parts only; storefront says "factory"
Insured headcount (latest annual report)unclearSingle-digit figure; consistent with a trading office, not a foundry
Abnormal operations / penaltiesverifiedNone listed
CertificatesclaimedECE R90 and ISO 9001 certificates are issued to a third-party foundry
Bank beneficiary nameverifiedMatches the licence name of Supplier B

In a real report, every supplier gets this table, with screenshots or document references in the appendix.

5. Recommendation

Shortlist A and C for samples. A is the strongest fit: verified in-house casting and machining, and the approvals it holds cover most of your references. C is a credible second source if it completes ECE R90 approval; we suggest asking for the application reference and expected date. B is a reasonable choice only if you are comfortable buying through a trader; if so, ask it to name the foundry and put that foundry's name on the contract.

6. Questions to settle before any deposit

  1. Supplier A: written confirmation of coating line capacity for your volume in Q1.
  2. Supplier C: name and location of the machining sub-supplier; agree whether we visit it.
  3. All: packing spec and carton marking photos before mass production.

7. Excluded suppliers (appendix, summarised)

9 suppliers excluded: 4 would not share a business licence; 3 could not quote the specified material; 1 had an abnormal-operations listing; 1 is a marketing client of Zhidian Network (named in a real report).

8. Limits of this report

This report records what we checked and observed on the dates stated. It is our own verification, not a certification or an accredited third-party audit, and it is not a guarantee of product quality, delivery or the supplier's future conduct. Certificates were looked up where the issuing body offers a public check; otherwise they are marked "claimed". Prices are as quoted by suppliers and may change.

Want this for your product?

Send the spec and quantity. We confirm the scope and a fixed price first.

Send an RFQ